/ Popular
XCD 87,347.00
The property is irregular in shape and gently slopes from the northern side down towards the southern side. All surface and grey water should be easily drained from the site, and there is no present risk of flooding which may be due to heavy rainfall. The support services and infrastructure for development of the surrounding lands are available in the order of lighting, road, water and other utilities.